EXPERIENCE
Reliable, High-Quality Excavation Solutions.
Our portfolio includes a wide variety of experience supporting public and commercial facilities and community infrastructure.
1. Duplicate a project card.
2. Duplicate a project modal.
3. Change the project-card_link's data-modal-open value (in the settings, under custom attributes).
4. Change the modal's data-modal value to match.
5. Edit content inside project-modal (you can see what layer in the navigator is hidden(display:none) . change it temporarily to flex to view and edit
Do not edit the modal script unless changing behavior.
To edit a project page do this:
1. First edit the card info this is separate from the pop up modal. Anything you add to the card won't show up on the modal.
2. select the project-card_link and go to the settings to see what project modal the card is connected to. In the attributes you will see a number. Than go to modals wrapper and count down to that number. so if you saw project 7, count down to project-modal 7. click on this modal and then check the settings to ensure its the same number in the attributes field. (its possible it was moved around. The connected modal will always have the same number in both the project card link and the project modal.
3.Once you have the selected project modal you want to open. Go to the style panel and add the combo class "is editing" you should see this pop up as an option once you start typing. This combo class will only open the modal that has this class, once you are done, simply remove the class. You can add and remove it to any of the modals to make changes and edits.
Make sure you have removed "is editing" before saving and publishing.






Test Picture
XXX
XXX | XXX

Constable Energy Storage

Seaside Energy Storage
Following our successful engagement on the Constable Energy Project, we provided design-assist support for another energy storage project. We provided cost estimates and supported development of various underground improvement options that addressed this project’s additional complexities from contaminated soils, liquifiable soils, drilled ground improvements, cement treated soils and the facility’s proximity to the Willamette River.
Our construction phase effort included excavation and grading efforts to support multiple different trades, including the concrete team, crane crews, boring of medium voltage feeds, site electricians and overhead transmission contractors. Our ground improvements included structural excavation for geopiers, grading for the concrete crews, and several thousand linear feet of electrical trenching. We worked in close coordination with the GC and our trade partners to schedule and sequence this work to maintain a streamlined flow for our teams and our trade partners.
High water tablesand deep excavation needs were a particular challenge for this project. TheC&W team managed a significant dewatering effort, leveraging dewatering wells, filtration of contaminated waters and other mitigation methods as we dug deeper, to overcome this complexity.
C&W also supported the public roadway re-construction of Time Oil Road and accesseasements. This project was completed complete on-budget and ahead of schedule.
Burgard Storm Sewer
Our team worked through upgrading roughly 5,000 LF of an existing storm sewer system and water quality swales within Burgard Way, maintaining access for Schnitzer Steels, Portland Container, and miscellaneous other businesses. In addition to working through an active roadway and operating industrial facility, our team developed multiple work plans to address unforeseen underground obstructions, high watertables, unstable sands, connection of undocumented storm sewer pipes, and crossing of active railroad lines.
OHSU Primate Research Center
Our team provides ongoing and major project support for maintenance and facility upgrades at OHSU. Our work is conducted in an active research facility with hazardous waste and pathogens. Some recent projects have included temporary pumped bypasses for utility relocates and upgrade and excavation of new structures, pens, loading facilities and chemical storage.
Analog Devices
We acted as the prime contractor to expand the existing receiving area, flammable storage facilities, and stormwater treatment facilities, which included utility reroutes. We managed a team of eight subcontractors, leading schedule development and weekly OAC meetings. We delivered this project ahead of schedule.
Peace Health Sewer Repairs
This project repaired a failing sanitary sewer system. Our construction approach included by passing the live system, connections for unforeseen sanitary sewer laterals, limited work hours and noise limitations to ensure ongoing quality of care for hospital patients. In addition to the exterior construction, we also excavated the basement level of the hospital while maintaining access for hospital staff to support sewer pipe replacement.

DTNA Corp 42
This project included demolition of an existing parking lot and regrading it for a new tilt-up building. The team navigated deep utilities, sewer, and stormwater infrastructure. With the building’s proximity to the Willamette Slough, we sequenced excavation crews in coordination with the ground pier, deep soil mixing, and cement treating subcontractors while maintaining the project schedule.
St. Helens High School Renovation and Addition
.jpg)
River Grove Elementary School
This new 79,800 SF school was built on the same site as the original building. The project included new parking and pickup/dropoff areas, a kitchen deliveries service yard, onsite stormwater treatment and detention, playground and playfield spaces, and a garden bed area. We provided erosion control, demolition, earthwork, structural excavation, landscape specialty footing prep, sanitary sewer, storm sewer system, waterline system, site finishes, public improvements, site electrical trenching, and plumbing trenching.
-p-500.jpg)
Park Place Redevelopment
This project reimagined a 16.5 acre community with site upgrades and new buildings to accommodate 224 new homes, a new street grid, walking and biking loop. Our work include erosion control, site demolition, tree protection and removal, mass excavation, grading, structural excavation, site and other utilities, and dewatering and water storage solutions.